Autex system experience

Autex acoustic installation specialists.

Experienced installation of Autex PET wall and ceiling systems for commercial interiors across London and the UK.

Large suspended acoustic ceiling grid assembled and installed below commercial building services
PET wall panelsFrontier finsRafts & bafflesFeature modules

Experienced Autex installers

Accurate setting-out, assembly and suspension.

Our teams work from coordinated drawings and product information to assemble, suspend, align and finish Autex systems around the architecture and building services.

Autex packages often combine visible precision with complex support conditions above the finished ceiling. We plan the setting-out, structural fixing, wire or rod suspension, unistrut support, module assembly, lifting sequence and final levelling around lighting, sprinklers, ventilation and containment.

For wall systems, we control datums, panel orientation, adhesive application, trims, corners, screen openings, sockets and perimeter details. Installation is completed to the approved project information and any manufacturer requirements specified for the package.

01

Autex PET wall panels

Panels cut, bonded and finished around doors, screens, sockets, trims and adjoining surfaces.

02

Frontier fins & baffles

Linear ceiling features set out, suspended and aligned to the coordinated reflected ceiling plan.

03

Suspended acoustic rafts

Pre-made or site-assembled rafts lifted, positioned and levelled with controlled suspension points.

04

Large-format ceiling modules

Sections assembled at floor level where practical, combined into larger modules and lifted in a planned sequence.

05

Feature grids & cassettes

Project-specific ceiling geometry coordinated with structure, access equipment and dense service zones.

06

Cut-outs, returns & trims

Visible details completed with accurate cutting and controlled interfaces to adjacent finishes.

Delivery sequence

Built around drawings, access and services.

  1. 01

    Review

    Autex product information, coordinated drawings, quantities, structure, fixing details and programme.

  2. 02

    Prepare

    Confirm datums, access equipment, delivery sequence, assembly space and protection requirements.

  3. 03

    Install

    Set out, drill, fix supports, assemble modules, lift, suspend, bond or mechanically fix as detailed.

  4. 04

    Finish

    Level, align, complete cut-outs and trims, protect the work and close outstanding items.

Related capability

One team for the connected acoustic package.

Autex systems can be delivered alongside other acoustic and fit-out elements where coordinated package responsibility helps the programme.

Explore our acoustic wall panel installation , baffles, rafts and fins capability , and commercial Autex ceiling case study .

Autex package

Planning an Autex installation?

Send the coordinated drawings, product schedule, quantities, programme, site location and access information for review.

Send us your drawings