Case study · Commercial joinery

High-spec commercial joinery installation in London.

Doorsets, ironmongery, timber wall panels, fitted elements and detailed interfaces installed within a finished commercial interior.

Completed commercial staircase with timber wall panels, fitted storage and brass balustrade
High-spec interiorLondonCommercial joineryFinished details

The challenge

Multiple visible details meeting in one finished space.

The joinery package required consistent lines across doors, timber panels, fitted storage and adjoining architectural finishes.

I&O installed manufactured joinery components to the coordinated drawings and schedules, checking openings, datums, grounds and fixing positions before final fit. Door leaves and ironmongery were adjusted for movement and clearances, while wall panels, trims and fitted elements were aligned to the intended reveals and surrounding surfaces.

The team protected completed finishes and worked through project-specific snagging so the connected elements read as one coherent interior.

01

Doorsets & frames

Commercial doors and frames fitted and adjusted to controlled gaps and operation.

02

Ironmongery

Hinges, closers, handles, locks, push plates and associated hardware installed to schedules.

03

Timber wall panels

Panels set out and fitted with controlled joints, corners and junctions.

04

Fitted storage

Manufactured elements installed and aligned to adjacent walls, floors and balustrade details.

05

Trims & reveals

Visible perimeter details checked for consistent shadow gaps and finished lines.

06

Snagging & adjustment

Door movement, hardware, protection and final outstanding items closed methodically.

Completed result

Joinery installed as part of the architecture.

  1. 01

    Openings checked

    Datums, tolerances and fixing grounds were confirmed before final fitting.

  2. 02

    Components aligned

    Doors, panels and fitted elements followed the coordinated reveals and room lines.

  3. 03

    Hardware adjusted

    Ironmongery and door movement were tested and corrected through installation.

  4. 04

    Details closed

    Visible junctions, protection and snagging were completed for handover.