Room survey
Walls, columns, corners, openings and finished equipment positions checked before cutting.
Case study · Acoustic wall systems
Commercial meeting-room walls installed with controlled setting-out, scribed perimeters, framing, trims and precise openings for screens and services.

The challenge
The wall-panel pattern needed to remain visually controlled while columns, corners and existing surfaces varied from the ideal drawing line.
I&O checked each room, established the working datum and prepared the grounds and framing required by the approved detail. Panels were squared and scribed on site where necessary, with screen openings, sockets, trims and corner interfaces measured from the confirmed finished positions.
The installation sequence protected the visible module pattern and allowed remaining AV and electrical interfaces to be completed accurately.
Walls, columns, corners, openings and finished equipment positions checked before cutting.
Support and build-up details installed to the approved package information.
Module joints and visual datums established consistently across each elevation.
Perimeter panels fitted to real columns and walls where site conditions were out of plumb.
Media openings formed to confirmed positions with controlled clearances and finished edges.
Visible junctions completed with consistent lines around returns and adjoining finishes.



Completed result
The panel pattern remained controlled from room to room.
Scribed panels absorbed out-of-plumb walls and columns without losing the visible line.
Screen, socket, trim and corner details were coordinated to confirmed positions.
Completed elevations were checked through snagging and handover.
Similar project
Review our commercial acoustic wall panel service, then send the elevations, product schedule, programme and site information.
Discuss your project